Laserfiche WebLink
`.. <br />City of Pequot Lakes <br />Wildlife Trail and North Sluetter Road Improvements <br />Preliminary Assessment Hearing <br />Tuesday, December 7, 2010, 6:00 p.m. <br />C. Improvements <br />Wildlife Trail: <br />• Use of the existing roadbed <br />• Approximate 2 -inch thick "sweetening" of Class 5 aggregate base <br />• 2 -inch thick 18 -foot wide (road in) and 16 -foot (loop) wide paved <br />surfaces <br />• 1 -foot wide Class 5 aggregate shoulders <br />• Bituminous gutters on either side of sags / low points <br />• Minimal clearing and roadway ditches where necessary to <br />accommodate drainage <br />• Erosion control during construction <br />• Anticipated minimal turf restoration <br />North Sluetter Road from County Road 168 to Wildlife Trail: <br />• Use of the existing roadbed <br />• Approximate 2 -inch thick "sweetening" of a 22 -foot wide Class 5 <br />aggregate base <br />• 2 -inch thick 22 -foot wide paved surface <br />• 1 -foot wide Class 5 aggregate shoulders <br />• Minimal clearing and roadway ditching <br />• Erosion control during construction <br />• Anticipated minimal turf restoration <br />Neither project includes work on private property (e.g. re- constructing <br />driveways). <br />Page 4 of 9 <br />