My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05.01 & 05.02 - Wildlife Tr/N Sluetter Improve-Public Hearing
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2010
>
12-07-2010 Council Meeting
>
05.01 & 05.02 - Wildlife Tr/N Sluetter Improve-Public Hearing
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2014 9:21:44 AM
Creation date
5/20/2014 9:11:53 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Pequot Lakes <br />Wildlife Trail and North Sluetter Road Improvements <br />Preliminary Assessment Hearing <br />Tuesday, December 7, 2010, 6:00 p.m. <br />D. Project Costs <br />Project costs include estimated construction, contingencies, engineering, <br />and administrative costs. <br />Wildlife Trail .... ............................... .......................$194,000 <br />North Sluetter Road ................ ..............................$ 771000 <br />Both.............................. ............................... $271,000 <br />The above estimated costs convey a general and approximate picture of <br />the costs that would probably be incurred today in carrying out the <br />proposed work. <br />Costs can vary widely depending upon many factors such as the actual <br />final design, weather, economic conditions, soil and ground water <br />�-- conditions, size of project, and the workload of available contractors. <br />`.. <br />Actual costs can only be determined by bidding the project. <br />Page 5 of 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.