Laserfiche WebLink
City of Pequot Lakes <br />Wildlife Trail and North Sluetter Road Improvements <br />Preliminary Assessment Hearing <br />Tuesday, December 7, 2010, 6:00 p.m. <br />D. Project Costs <br />Project costs include estimated construction, contingencies, engineering, <br />and administrative costs. <br />Wildlife Trail .... ............................... .......................$194,000 <br />North Sluetter Road ................ ..............................$ 771000 <br />Both.............................. ............................... $271,000 <br />The above estimated costs convey a general and approximate picture of <br />the costs that would probably be incurred today in carrying out the <br />proposed work. <br />Costs can vary widely depending upon many factors such as the actual <br />final design, weather, economic conditions, soil and ground water <br />�-- conditions, size of project, and the workload of available contractors. <br />`.. <br />Actual costs can only be determined by bidding the project. <br />Page 5 of 9 <br />