My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09.02 Traffic Study
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2019
>
03-05-2019 City Council Meeting
>
09.02 Traffic Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/28/2019 11:00:05 AM
Creation date
2/28/2019 11:00:01 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
February 25,2019 WIDSETH <br /> Proposal for Tra�c Study SMITH <br /> City of Pequot Lakes <br /> Page 3 NOLTING <br /> G. The first of two anticipated meetings with the City(and others as needed)will occur after <br /> delivery of the Existing Conditions Memorandum. <br /> The information of the memo will be presented along with initial thoughts on <br /> changes. <br /> This meeting will be an opportunity for the City to discuss their views of the future <br /> study area and speciflc factors for consideration. <br /> H. Using the information from the previous tasks, analyze the Patriot Avenue geometry from <br /> West Lake Street on the south up to Front Street on the north. <br /> The lane configurations will be examined to determine if changes are feasible given <br /> the current, and projected, level of traffic. <br /> Future traffic forecasts will be determined using a growth factor based on prior <br /> studies and recent growth in the area. Potential improvement options and roadway <br /> changes will be tested using these forecasts to ensure acceptable operations now <br /> and into the future. <br /> Options could include narrowing or reducing lanes, providing parallel or diagonal <br /> parking, and improving walkabiliiy. <br /> This analysis will focus on the traffic and traffic operations, knowing other factors will <br /> need to be considered for any changes in the area. <br /> A matrix will be developed to compare potential options based on the traffic <br /> analyses. <br /> I. Analyze the remaining study intersections based on their current traffic, projected traffic, <br /> geometry, and traffic control. <br /> The goal will be to determine if geometry or traffic control modifications are needed <br /> or could be completed to improve the traTfic flow and increase walkability or multi- <br /> modal friendliness. <br /> A specific focus will be placed on the existing signal system of the Patriot Avenue/ <br /> Main Street intersection and the existing all-way Stop at the Rasmussen Road/Main <br /> Street intersection. <br /> A matrix may be developed to present and compare options, if multiple viable <br /> improvements are available. <br /> J. Prepare a Draft Final Report document with results and recommendations of the previous <br /> tasks. <br /> A summary graphic will be part of this report to show the recommendations for the <br /> study area. <br /> K. The second of finro anticipated meetings with the City(and others as needed)will occur after <br /> the release of the Draft Final Report to discuss the results and recommendations. <br /> This meeting will provide the City a time to discuss potential questions, comments, <br /> and other changes that may be desired before the report is finalized. <br /> L. Prepare a Final Report document from the comments obtained above for the City's use. <br /> As in the Draft, a summary graphic will be part of this report to show the <br /> recommendations for the study area. <br /> N:UNarketing Dept�Proposals\00 Letter Proposals�2019 Letter ProposaflPequot Lakes-13-Draft for Traffic Study.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.