Laserfiche WebLink
New Parking Lot o�the sauth side of Sibley Street�$7.75,OOQ <br /> Clarifiers:This improvement does need to coordinate with starm drainage system improvemerrtS and <br /> Sibley Street improvements. <br /> Watermain Replacement under Sibley Street tt$100,000 <br /> dariflers:Replace thesg before putting a new roadway on top.This cost does nat include erosion <br /> control as same kind of roadway work(with erosion corrtrol)would be needed too. <br /> Sanitary Sewer Replacement under Sibley Street tt$120,000 <br /> Clarifiers:Replace these before putting a new roadway on top.Tt�is cost does not include erosion <br /> control as some kind of roadway work(with erosbn control�would lae needed too. <br /> Again,the above estimated cost breakdowns for different sets of improvements incorporete the full <br /> price cf general bid ttems. It is challenging to try and take an"a ia carte"approach to splittUng out <br /> differeM sets of improvements and corresponding costs. <br /> Thank you, <br /> 'Rm Haule,PE <br /> Civtl Engineer,VP <br />