My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09.04A-B Trailside Park Project
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2019
>
01-08-2019 City Council Meeting
>
09.04A-B Trailside Park Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2019 10:27:20 AM
Creation date
1/4/2019 10:27:19 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
New Parking Lot o�the sauth side of Sibley Street�$7.75,OOQ <br /> Clarifiers:This improvement does need to coordinate with starm drainage system improvemerrtS and <br /> Sibley Street improvements. <br /> Watermain Replacement under Sibley Street tt$100,000 <br /> dariflers:Replace thesg before putting a new roadway on top.This cost does nat include erosion <br /> control as same kind of roadway work(with erosion corrtrol)would be needed too. <br /> Sanitary Sewer Replacement under Sibley Street tt$120,000 <br /> Clarifiers:Replace these before putting a new roadway on top.Tt�is cost does not include erosion <br /> control as some kind of roadway work(with erosbn control�would lae needed too. <br /> Again,the above estimated cost breakdowns for different sets of improvements incorporete the full <br /> price cf general bid ttems. It is challenging to try and take an"a ia carte"approach to splittUng out <br /> differeM sets of improvements and corresponding costs. <br /> Thank you, <br /> 'Rm Haule,PE <br /> Civtl Engineer,VP <br />
The URL can be used to link to this page
Your browser does not support the video tag.