My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09.04A-B Trailside Park Project
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2019
>
01-08-2019 City Council Meeting
>
09.04A-B Trailside Park Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2019 10:27:20 AM
Creation date
1/4/2019 10:27:19 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
From: SAS+As�sodates[maU�saslandar�ch.mm] <br /> Sen� W�y,November 2t,201a 3:19 PM <br /> Subiec� Trailslde Rark Revlsed dudget Proieclion <br /> Good afternoon Nancy, <br /> luke asked me to put tagether a revised budget projection for a reduced scape of wark for Trailside <br /> Park,including only the flag display and the splash pad. Please see attached. <br /> Included tn these numbers is some assumpttons and unknowns,wch as the flnal design and location of <br /> the splash pad which may change the requirements for grading,water,electrical,removals,new watks <br /> needed,etc. Other ttems I have removed from the budget projection,such as fencing,benches,bitce <br /> racks,trash receptacles,new It�hting,in an attempt to keep the costs to�minimum. <br /> So until a revised design Is in place,and the work is actually bid,these numbers may go up or down. <br /> But looking at these flgures,and figu�ing the$donation for the splash pad and flag dkplay,it is{ooking <br /> like the City's contribution will be somewhere aroand+/-$400,OOD. <br /> Ti�ank you. <br /> Matthew <br /> SAS+Associates,[nc <br />
The URL can be used to link to this page
Your browser does not support the video tag.