Laserfiche WebLink
�,_ , City of Maple Grove, MN Fish Lake Tower <br /> �, Reconditioning of: 1,500,000 Gallon Hydropillar <br /> ���,� ' <br /> � � �� •Dates of Service: 2011 Mixer, 2014 Evaluation Services, 2015 Reconditioning <br /> •Conditions 8�Services: This water tower project included a pre-assessment of the conditions, <br /> including an updated engineer cost estimate. Plans and specifications were approved as well as a . <br /> . �4#�� qualified contactor during the bid process. KLM worked with the contractor on submittals including <br /> coating selection, drawing reviews, scheduling and more. KLM's Antenna Division worked with <br /> �t` multiple cellular carriers to coordinate efforts of relocating cellular equipment to temporary <br /> ,4# locations during the reconditioning of the tower. KLM conducted weekly meetings on site to <br /> synchronize the efforts of the city, engineer, and contractor(s)as the project commenced. The <br /> project was successful being completed on time and within budget. <br /> � : <br /> �, �'�° ,: <br /> : � "� _ , �: . <br /> - ��� � City of Lino Lakes, MN Tower No. 1 <br /> � Reconditoning of: 1,000,000 Gallon Single Hydropillar <br /> •Dates of Service: 2013 Floatdown Evaluation Services, 2016 Reconditioning Services <br /> •Conditions 8�Services: KLM performed a floatdown evaluation of Tower Number 1. KLM <br /> - � worked with the Utilities Supervisor on the project to provide plans and specifications.A qualified <br /> �'' . contractor was selected to perform the reconditioning of the tower. A full containment system was <br /> �' utilized during the project. KLM provided construction management, full time AWS, NACE <br /> < inspectors, and antenna management throughout the project.A new logo was painted on two <br /> 'ri` ,,. �_� ;, sides of the tower, choosing Tnemec Hydroflon for the topcoat on the exterior of the tower. The <br /> tower can be seen from Hwy 35W&23. <br /> � � <br /> $t� <br /> � City of Sauk Rapids, MN SummitAvenue Standpipe <br /> Design Build of: 750,000 Gallon Standpipe <br /> •Dates of Service: 2015 Evaluation Services, 2016 Reconditioning, 2016 Mixer <br /> •Conditions 8�Services: KLM was contracted to perform structural and coating repairs on the <br /> interior and exterior caused by ice damage. Before the project began, an evaluation was <br /> ` completed to quantify the amount of structural repairs and coating replacement required. In <br /> addition to the structual and coating repairs, KLM provided the City with a new GS-12 mixer and <br /> , SCADA control box to combat future ice issues.The project was completed on time and within <br /> budget. <br /> 10 City of Pequot Lakes <br /> �yla.a:� <br />