Laserfiche WebLink
�0(�E��,y City of Dodgeville, WI <br /> � ' '`�� �.-��" '�� Design Build Reconditioning of: 500,000 Gallon Single Pedestal <br /> •Dates of Service: 2016 Reconditioning and Evaluation , <br /> •Conditions&Services: KLM was contracted to perform a full reconditoining with ' <br /> structural modications to bring the tank to OSHA and AVWVA compliance. Before the <br /> project began, an evaluation was completed documenting the current conditions of the , <br /> tower. The interior wet and exterior of the tank had a full coating replacement. The ' <br /> interior dry sweating areas also underwent a full coating replacement.The coating ' <br /> system used on this project was based on the most recent technology-a Tnemec ' <br /> coating system with a zinc primer, epoxy intermediate coat,2nd intermediat coat of ' <br /> urethane and a fluoropolymer topcoat.The project was completed on time and within <br /> budget. <br /> ,;��;_ ' � <br /> � ` � Sauk Rapids, MN Tower No. 2 <br /> " � <br /> $� �� Design Build of: 500,000 Gallon Single Pedestal <br /> •Dates of Service: 2015 Reconditioning/Design Build Services <br /> •Conditions&Services: KLM was selected as the Design Build team for the reconditioning <br /> of this tower. Due to inaccurate data provided, KLM took the initiative to re-evaluate the <br /> tower to accurately identify the scope of services needed including full containment, and <br /> �' `��' upgrading the coating system to emphasize the specific color scheme. Along with preparing <br /> � specifications, KLM retained a contractor and provided project construction management, <br /> design services, and full-time inspection throughout the duration of the project. The tower <br /> was completed to the full requirements of Sauk Rapids. <br /> � <br /> St. Olaf College, Northfield, MN <br /> : �, Design Build of: 150,000 Gallon Double Ellipsoid <br /> •Dates of Service: 2011 Mixer,2014 Evaluation Services, 2015 Reconditioning/Design Build <br /> � f •Conditions 8 Services: KLM was selected as the Design Build team to recondition the <br /> � �� +;� tower. The high degree of difficulty with this project consisted of extensive structural repairs <br /> � � � � to bring the tower up to OSHA,AVWVA, and Health Standards and the proper removal, and <br /> ' disposal of lead based coatings on the interior and exterior areas of the tower within MPCA <br /> �� � ��� ` � regulations. KLM maintained a construction schedule to coincide with the local college <br /> �� summer break in classes. Along with preparing specifications, KLM retained a contractor <br /> ? j� �� � � and provided project construction management, design services, and full-time inspection <br /> ► . throughout the duration of the project. The tower was completed to the full requirements of <br /> � -_ � �' St. Olaf College. <br /> _ _ _ __ _ _ � <br /> 11 City of Pequot Lakes �s <br /> �*� T <br /> i�iYY. <br />