Project Profiles
<br /> KLM has an unparalleled record of consistently delivering successful projects like yours.
<br /> KLM has planned, designed, and refurbished water towers for the past twenty years.
<br /> The longevity of our projects is what we are most proud of. What owners most
<br /> appreciate is the return in investment KLM brings to each rehabilitation project. The
<br /> following pages list projects KLM has completed, like the proposed tank for the City of
<br /> Pequot Lakes, MN.
<br /> �rr Ptymouth City of Plymouth, MN Tower 101/55
<br /> Reconditioning of: 3,000,000 Gallon Hydropillar
<br /> •Dates of Service: 2013 Reconditioning, 2015 Warranty Inspection
<br /> � •Conditions 8�Services: This tower is one of the largest elevated water storage tanks
<br /> in the country. The water tower project included a pre-assessment of the conditions,
<br /> including an updated engineer cost estimate. Plans and specifications were approved '
<br /> fi as well as qualified contactor during the bid process. KLM worked with the contractor
<br /> � on numerous submittals including coating selection,drawing reviews, scheduling and ',
<br /> more. KLM's Antenna Division worked with several carriers to coordinate efforts of ,
<br /> relocating cellular equipment to temporary locations during the reconditioning of the
<br /> � tower. KLM conducted weekly meetings on site,to synchronize the efforts of the city, ,
<br /> ' ` engineer and contractor(s)as the project commenced. The project was successful
<br /> being completed on time and within budget. The warranty ROV inspection found ',
<br /> , virtually no coating failures on over 100,000 square feet of surface area.
<br /> �IRIE ,. City of Eden Prairie, MN Market Center Tower
<br /> �`r ' ;.�„ Reconditioning of: 2,000,000 Gallon Composite '
<br /> �E�; •Dates of Service: 2016 Reconditioning
<br /> •Conditions 8�Service: The Market Center Tower is an iconic structure for the City,
<br /> with working clocks on the main column. Given the high profile, size, and challenging
<br /> . ° location of this tower, the City Manager(Rick Wahlen)performed detailed interviews
<br /> with each bidding consultant and their staff,to select the best qualified firm to provide
<br /> the engineering and inspection services required by the Ciry. As the awarded
<br /> consultant, KLM provided design services, construction management, full time AWS
<br /> E " welding and NACE coating inspections throughout the duration of the project. Rick was
<br /> instrumental in the project from the beginning of pre-construction to the final walk
<br /> through and close out, including personally climbing the tower regularly to confirm the
<br /> project had met his standards. Given the tight confines of the jobsite, KLM conducted
<br /> weekly meetings locally to update the neighboring businesses and residents as the
<br /> project commenced. The project was successful, being completed on time and within
<br /> budget. ?i�1 i TnPrn� i�,r,t. �E t�2 Year 2���_i �C�.irir�e� Up
<br /> .� �,��,,,► ��,,�,�,
<br /> k City of Mendota Heights, MN Lexington Ave. Tower
<br /> � Reconditionin of: 2,000,000 Gallon Tower
<br /> 9
<br /> •Dates of Service: 2010 Reconditioning, 2012 Warranty Inspection, 2013 Antenna ',
<br /> Engineering Services, 2015 Antenna Engineering Services I
<br /> •Conditions 8 Services: As the approved consultant for the Lexington Avenue Tower, �,
<br /> _,--.. KLM completed an evaluation for preparation of the specification for reconditioning of �,
<br /> the tower. This project presented obstacles as it needed full containment per MPCA ',
<br /> requirements due to the existing coating containing chromium. KLM worked hand in '
<br /> hand with the MPCA to monitor air quality during the removal of the coating. In ',
<br /> • addition, KLM worked with the FAA on height restrictions and light obstruction as the '
<br /> tower was in the flight pattern of the Minneapolis Airport. This reconditioning project '
<br /> was successfully completed to clienYs request. The Lexington Tower can be observed '
<br /> from 494/Highway 35 and the airport daily.