My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09.02 Painting of White Water Tower
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2018
>
08-07-2018 City Council Meeting
>
09.02 Painting of White Water Tower
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/3/2018 1:58:31 PM
Creation date
8/3/2018 1:58:28 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
The recommendation for the KLM Engineering quote is due to the fact that KLM <br /> is using a polyurethane paint with a special UV protective substance which will <br /> resist fading longer than the product utilized by CTC. Red paint is highly <br /> susceptible to fading and their product should last at least 10 years, if not more. <br /> Also, KLM has a history with the City, excellent service, superior product, and a <br /> willingness to get the job done right. CTC also came highly recommended from <br /> the communities that have used them but there is value in working with a company <br /> a little more "local" that has experience with the City's water tower. <br /> Council Action Requested: Council motion to accept the quote from KLM <br /> Engineering Inc. in the amount of$61,871 for the power washing and painting of <br /> the City's white water tower to resemble a red and white bobber to be paid from <br /> the Water, General, and Bobber Water Tower funds as presented. <br />
The URL can be used to link to this page
Your browser does not support the video tag.