My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09.01 Water Plant Process Control System Upgrade
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2018
>
06-05-2018 City Council Meeting
>
09.01 Water Plant Process Control System Upgrade
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2018 8:51:15 AM
Creation date
6/1/2018 8:51:14 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
� Integrated Pracess Solutions, ir�c. <br /> Corporate O,�ice: PO Box 2!y Fos�on,MN 56542 <br /> SK�i4,t2st sE ellS?,�33�t w fOscoopsRmd <br /> FOs�to11,MN3iS42 F�rltlApt�1�1�Y5502t W��d(Iei 1At!'.�7 <br /> �lt.IS3-77� it27+J16�t t�f/�iR4?3 <br /> February 27,2018 <br /> City of Pequot Lakes <br /> Andrew Schwartz <br /> RE: Pequot Lakes WTP Controls Upgrade <br /> Dear Andrew, <br /> Integrated Process Solutions,Inc.is pleased to grovide the following proposal for upgrading and <br /> replacing the Pequot Lakes existing control system. C3ur proposal is based on our recent site visit <br /> and knowledge of the exiating system. We offer the following for your review and <br /> consideration. <br /> Water Treatment Plant <br /> We propose to replace the back panel in the e�cisting filter control penel located in the control <br /> room with a new back panel. All components will be replace�i�d a new Allen Bradley <br /> Compact Logix PLC will be utilized A network switch will be added and a new Allen Bradley <br /> Operator Interface Terminal will be installed. <br /> A new personal computer will be provided,and tb.e existing Wonderware HMI Soflwaze will be <br /> ttpgraded to the latest version. A UPS will be provided for the new computer work starion,a <br /> network switch and fire wall will be installed for remote access and trouble shooting. A new <br /> automatic telephone dialer will be installed and configured for critical alarms. Existing gaphic <br /> screens will be duplicated and perform exactly as the existing system. New operatar interface <br /> terminal screens will be developed aad the OIT will serve as a back up should the HMI computer <br /> not be in service. <br /> We propose to replace the existing Allen Bradley 5LC PLC in the water plant control panel <br /> located in the filter room with Allen Bradley remote UO. A new ethernet switch wi.11 be installed <br /> for communication to the main PLC. A new UPS will be installed in the existing panel. A new <br /> , ethernet radio will be installed in the existing panel and new antenna,cable,and connectors will <br /> provided and installed The main PLC in the control room will be utilized to perform all control <br /> 4 �unctioris and be programed to control t�re water treatment plant. <br /> Water Tower <br /> We propose to provide a new back panel to be installed in the existing control panel at the water <br /> tower. The new back panel will have all new components and will include a new ethernet radio <br /> and network switch New antenna,cable,connectors will be provided and inatalled <br /> . , . , . . <br />
The URL can be used to link to this page
Your browser does not support the video tag.