My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09.01 Water Plant Process Control System Upgrade
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2018
>
06-05-2018 City Council Meeting
>
09.01 Water Plant Process Control System Upgrade
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2018 8:51:15 AM
Creation date
6/1/2018 8:51:14 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
General Services Included <br /> Complete Syatem Drawings <br /> Back Panel Fabrication and UL listing <br /> PLC Programming <br /> HNII(VVonderware)Configuration and Programming <br /> Radio Configuration and Frogramming <br /> Network Configuration <br /> Factary Testing <br /> Complete Electrical Installation <br /> Startup&Testing <br /> System Training <br /> One Year Warranty Parts and Labor <br /> Electrical Permit <br /> The total price for this proposal is 5 24.Q0 net,excluding sales ta7c. <br /> Thank you for the opportunity to provide our proposal to you for your consideration. Should you <br /> have questions or require further infarmation concerning this proposal,please contact me at 21& <br /> 435-1703. <br /> We look forward to earning your business, <br /> � <br /> �,���._ <br /> Peter J.Nelson <br /> Integrated Process Solutions,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.