My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09 - Water Wastewater Monthly Report
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2011
>
03-01-2011 Council Meeting
>
09 - Water Wastewater Monthly Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2014 10:39:50 AM
Creation date
3/13/2014 3:56:10 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
� <br />� <br />� <br />Water Deut. <br />Operations and Maintenance Continued: <br />• Feb 19�', delivered 19 water/sewer bill delinquent notices. <br />• Feb 21 St, received calls from John Ryan, Mike Loven and Tom Jones about the water <br />leak at 30713 State Hwy 371 (north of Oasis Bldg) I called Lee Bundy (PRASD <br />Manager) who was on-call, and asked him to check it out for me and report back. I then <br />made a call to GSOC for an emergency locate knowing it would need to be repaired <br />soon. Lee called to inform me it wasn't too bad, could probably wait until Tuesday, said <br />he put caution tape around the area and informed the employees at Sarie's Restaurant. I <br />called Al DeChantal and asked if he would be able to do the work. He went in to check <br />it out and called to inform me it should be addressed today. I went in and verified the <br />situation, and asked A1 to perform the work. I contacted the DQ, Sarie's Restaurant, and <br />the Speedstop Gas Station and Laundromat to inform them we would need to shut the <br />water off to do the work. We had the water shut off from 330pm to 6:OOpm. Luckily, <br />the restaurant closed at 2:OOpm. However, the DQ had to shut their doors. They were <br />normally open until 8:OOpm. It appears the problem is between the new curbstop and <br />the north end of the bldg. We were finally able to close the curbstop valve and get the <br />water back on to the bldg by 6:OOpm. <br />• Feb 22°d, called Mike Loven and asked for the job print. Kurt Eckardt met me over at <br />the Oasis Bldg and explained what he remembered was done. He also gave me the job <br />print. I made some copies and gave the original back to Mike. <br />Wastewater Dept. <br />I. Facilitv Performance: <br />a. CBOD Concentration <br />Influent — 440 mg/1 <br />Effluent — mg/1 <br />b. TSS Concentration <br />Influent — 248 mg/1 <br />Effluent — mg/1 <br />(No Design Listed) <br />(No Design Listed) <br />c. Effluent Fecal Coliform — NA <br />Permit Condition — 200 organisms/100 ml <br />d. Flow - Average Daily Flow — 55,000 gallons <br />Maximum Daily Flow — 67,000 gallons <br />Minimum Daily Flow — 44,000 gallons <br />Total Monthly Flow — 1,156,000 gallons <br />(Design —121,795 gaUday) <br />(As of the 22nd) <br />
The URL can be used to link to this page
Your browser does not support the video tag.