Laserfiche WebLink
Wastewater Dept. Continued <br />� <br />II. Operations and Maintenance: <br />• The monthly MPCA Discharge Monitoring Report (DMR) was completed and <br />submitted. <br />• Feb 4�`, met with Jerry Akerson and explained (in greater detail) the charges for our lift <br />station alarm units (Omni-Sites) and brought him out to our main lift station for a look. <br />• Feb 7th, received a call about a sewer backup on the north end of Front Street. Checked <br />our dead-end manhole and it was frozen. Kurt and I tried thawing it with the Tanker, but <br />it was frozen solid. Had to call Jeremy Fyle in to steam the lines. <br />• Feb 14�', asked Mike Rude for updated Sanitary Sewer Map and Confined Spaces Map. <br />Made copies for the Fire Dept. <br />• Also on the 22"d, I received a ca11 about a sewer backup. I checked our manholes on <br />Ash Street and two of them were backing up. Jetted from Brown and Ash to dead-end <br />manhole north of manhole at West Sibley and Ash St. Pulled out a large clump of roots <br />and pulled back lots of heavy sludge. Sewer main is free flowing again. <br />� <br />Report Submitted By: Tina Nolden (Water/Wastewater Manager) <br />Please call me if you have any questions/comments. <br />218-568-5604 or 218-820-2125 <br />� <br />