My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08 - Approval of 6-16-2005 Minutes
Laserfiche
>
Planning & Zoning
>
Agenda Packets
>
2005
>
07-21-2005 Planning and Zoning Meeting
>
08 - Approval of 6-16-2005 Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2016 9:01:58 AM
Creation date
7/29/2016 9:01:58 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1. Topographic survey with 2' contours. <br /> 2. Structures need to be shown on survey. <br /> 3. MnDOT feedback on access. <br /> A motion was made by John Derksen, seconded by Roger Varilek,to table this matter. <br /> All members voted"aye". Motion carried. <br /> APPLICANT: Patrick J. Smith on behalf of Jon Hake. <br /> Applicant requests a metes and bounds subdivision. <br /> Mr. Marohn explained the Staff Report and highlighted the 3 parcels. <br /> A motion was made by Dean Williams, seconded by Bill Habein,to approve the metes <br /> and bounds subdivision, subject to the following conditions: <br /> 1. The West lot shall be joined, being 0.1 acres, with Tract B of the Kennedy <br /> subdivision. <br /> 2. The remaining Hake parcel must be described in final state before City stamps <br /> survey. <br /> All members voted"aye". Motion carried. <br /> APPLICANT: Patrick J. Smith on behalf of Dawn Kennedy. <br /> Applicant requests a metes and bounds subdivision. <br /> Mr. Marohn explained the Staff Report and added the following: <br /> Based on the finings of fact in this report,the Staff recommends that the metes and <br /> bounds subdivision be approved with the following conditions: <br /> 1. The final descriptions of Tract A and Tract B shall be provided prior to filing of <br /> the subdivision. <br /> 2. An easement shall be provided to Tract A and Tract B for a consolidated <br /> driveway. <br /> 3. An access permit shall be obtained from Crow Wing County prior to filing of the <br /> subdivision. <br /> 4. The western portion of the existing driveway in Tract B that encroaches within <br /> the proposed property line setback shall be removed. <br /> 5. The shed that exists on the proposed lot line shall be removed. <br /> 6. Staff shall verify that the lot width meets the minimum width of 100 feet at the <br /> lake and building setbacks. <br /> 7. The sewage treatment system serving Tract B shall be relocated to Tract B. <br /> A motion was made by Dean Williams, seconded by Tom Adams,to approve the metes <br /> and bounds subdivision, subject to the above 7 conditions. All members voted"aye". <br /> Motion carried. <br /> Planning Commission 4 <br /> June 16, 2005 <br />
The URL can be used to link to this page
Your browser does not support the video tag.