Laserfiche WebLink
MINUTES <br /> REGULAR MEETING <br /> PEQUOT LAKES PLANNING COMMISSION/ <br /> BOARD OF ADJUSTMENT <br /> SEPTEMBER i9, 2oi9 <br /> PRESENT: Mark Hallan (chairperson),Wesley Wilson, Nathan Norton, Laura Larson, <br /> Andrew Birch and Tom Paulbeck. ABSENT: Christopher Savino. <br /> CITY PLANNER: Justin Burslie, Sourcewell <br /> ZONING SPECIALIST: Absent <br /> COUNCIL LIAISON: Mayor Tayloe <br /> The meeting was called to order by Chair Hallan at 6:0o PM. <br /> PUBLIC HEARINGS: <br /> APPLICANT: Alan J. Brown <br /> Applicant requests a Variance to construct a cabin within the setback of <br /> East'I�vin Lake <br /> MOTION BY PLANNING COMISSION MEMBER WIISON, SECONDED BY <br /> PI.ANNING COMMISSION MEMBER BIRCH, TO OPEN THE PUBLIC <br /> HEARING. PASSED UNANIMOUSLY. <br /> Mr. Burslie explained the Staff Report. Applicant was present. <br /> Planning Commission Member Norton asked why staff recommended condition number <br /> two has two different elevations. Burslie stated the elevations are in different datums <br /> and the surveyor will determine which of the two is higher. <br /> Mr. Brown (applicant) stated there is limited space to construct a dwelling on the <br /> property due to the wetlands and driveway to the west and the lake to the east. <br /> Chair Hallan asked how wide the driveway easement is. <br /> Mr. Burslie stated the width is not identified on the survey. <br /> Planning Commission Member Paulbeck asked Mr. Brown if the driveway/easement <br /> drains ok. <br /> MINUTES 1 <br /> Pequot Lakes Planning Commission <br /> September 19, 2019 <br />