Laserfiche WebLink
cZ�y of <br /> AGENDA ITEM #9.4.A-C <br /> Pe uot <br /> q <br /> Lakes = _ <br /> REPORT TO <br /> CITY COUNCIL <br /> Report Prepared by: Tim Houle <br /> Date: September 5, 2017 <br /> Sub_iect: 2018 Proposed Street Improvement Projects <br /> Report: Staff would appreciate guidance on which of the <br /> following improvements the City would like to undertake <br /> next year. Preferably, surveying could be done in the fall, <br /> design in the winter, competitive spring bids can be <br /> obtained, and construction can occur during the summer. <br /> The East Sibley Street Project is roughly from Front Street <br /> to Government Drive and is tied to the proposed Trailside <br /> Park Improvements. No study has been completed yet to <br /> give us a rough idea of scope and costs. <br /> The County Road 112 Proj ect is from the 4-way stop sign <br /> at Main Street north to the new roadway built as part of the <br /> Hwy 371 project. There was a very rough estimate of scope <br /> and costs provided during turn back negotiations with the <br /> County. We did not get down to enough detail back then to <br />