My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09.04A-C 2018 Proposed Street Improvement Projects
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2017
>
09-05-2017 City Council Meeting
>
09.04A-C 2018 Proposed Street Improvement Projects
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2017 10:34:21 AM
Creation date
9/1/2017 10:34:21 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
, <br /> , <br /> determine where stormwater along this roadway would be <br /> discharged to. Monies for improvements on this segment <br /> are provided by the County as part of the turn back <br /> agreement. <br /> The Downtown SE Street Quadrant Project segment or <br /> segments is not yet defined. A Storm Drainage Study has <br /> been performed, so if the City wants to improve a street <br /> segment or segments, we have a plan with how we could <br /> deal with stormwater. As you probably recall, a discharge <br /> location and basin is the most challenging part of any <br /> improvements in this quadrant (other locations could be <br /> investigated, but would require longer reaches of pipe to <br /> get to). There has been no study completed yet to give us a <br /> rough idea of scope or costs on improving any particular <br /> street segments. <br /> Council Action Requested: Council direction on which <br /> improvements the City wants to move forward with so a <br /> proposal can be obtained. <br />
The URL can be used to link to this page
Your browser does not support the video tag.