My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09.01 - CSAH 11 Temporary Route Conditions
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2016
>
02-02-2016 Council Meeting
>
09.01 - CSAH 11 Temporary Route Conditions
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2016 2:48:39 PM
Creation date
1/28/2016 2:48:36 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
of <br /> city AGENDA ITEM #9.1 <br /> � <br /> Pequott <br /> Lakes— <br /> REPORT TO <br /> CITY COUNCIL <br /> Report Prepared by: Tim Houle <br /> Date: February 2, 2016 <br /> SuMect: CSAH 11 Temporary Route Conditions <br /> Report: At the January City Council Meeting, draft conditions were <br /> presented for Mathiowetz's proposed re-route of CSAH 11 to facilitate <br /> construction of the CSAH 11 interchange with the new 4-lane divided <br /> Highway 371. At this meeting, the Council approved the "Derksen Road" <br /> route for CSAH 11. While it seemed the Council was in consensus with the <br /> conditions, the approval did not include the conditions. Since then, we <br /> adjusted some language to (hopefully) reflect Mathiowetz's <br /> requests/comments from that night. The revised conditions are noted below. <br /> Please note that item number 13 includes an expenditure of$15,000 in City <br /> funds to contribute toward the paving of Derksen Road. <br /> 1) The City's approval is contingent on the County's approval (they have <br /> weighed in and are in agreement with these conditions —the County will <br /> not have a separate agreement) and on MnDOT's original Design-Build <br /> Contract. <br /> 2) The two main reasons (there are others) a re-route is being considered is <br /> for safety and to continue relatively uninterrupted traffic flow. <br /> Mathiowetz will ensure both of these conditions are met. This will <br /> include, but not be limited to, a safe design and construction, proper <br /> signing and pavement markings, etc. as well as providing immediate <br /> adjustments to promote safety; and minimal construction equipment <br />
The URL can be used to link to this page
Your browser does not support the video tag.