My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09.01 - CSAH 11 Temporary Route Conditions
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2016
>
02-02-2016 Council Meeting
>
09.01 - CSAH 11 Temporary Route Conditions
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2016 2:48:39 PM
Creation date
1/28/2016 2:48:36 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
crossings (with proper advance signage and flagging) of the re-routed <br /> CSAH 11. <br /> "Minimal crossings" will be defined as one set crossing location, <br /> crossings not occurring from 7 am to 9 am and 2 pm to 4 pm (afternoon <br /> mainly due to school dismissal times), crossings not occurring after noon <br /> on Fridays or the day before a Holiday, and crossings not occurring when <br /> it adversely backs up traffic (i.e. in the case of special events outside <br /> these other limits), unless prior approval is obtained from MnDOT in <br /> coordination with the County and the City. <br /> 3) The temporary re-route location will be as indicated on the attached one- <br /> page figure. Mathiowetz will submit "final design" documents for <br /> MnDOT, County, and City review and approval. Mathiowetz will pay for <br /> ALL aspects of survey, design, temporary easements, construction, <br /> operation, and maintenance of this temporary re-route unless otherwise <br /> indicated. <br /> 4) The present Highway 371 — including from the existing stop light at <br /> CSAH 11 south to wherever the re-route intersects Highway 371 —will <br /> `• remain the responsibility of MnDOT. The existing CSAH 11 west of the <br /> interchange construction and the existing CSAH 11 east of the point <br /> where the eastern end of this proposed re-route connects to the existing <br /> CSAH 11 will remain the responsibility of the County. <br /> 5) The duration of this temporary re-route will be from approximately mid- <br /> May 2016 until November 30, 2016. Should the re-route need to continue <br /> longer than this (either in 2016 or into 2017 after a 2016-2017 winter <br /> shut-down), Mathiowetz shall come back to the City and the County and <br /> request an appropriate extension and re-negotiation of these conditions. <br /> 6) CSAH 11 is a part of the Paul Bunyan Scenic Byway system. <br /> Mathiowetz shall provide minimum 4-feet wide shoulders to <br /> accommodate possible users of the Byway. Mathiowetz shall coordinate <br /> with MnDOT (and in turn, the DNR and the Byway Association) on <br /> coordinating and providing signing along the Paul Bunyan Trail and <br /> CSAH 11 giving direction as to how multi-modal users should travel the <br /> Byway. This coordination includes the Byway's website. <br />
The URL can be used to link to this page
Your browser does not support the video tag.