My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07 - Sibley Acres Turn Around Area
Laserfiche
>
Planning & Zoning
>
Agenda Packets
>
2005
>
03-17-2005 Planning and Zoning Meeting
>
07 - Sibley Acres Turn Around Area
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2016 11:02:41 AM
Creation date
7/28/2016 11:02:41 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UJiuoicuua Ur :uo rae cto aoo Doou 111Y ur rnduui LAnna *I UVL <br /> February 25, 2005 WIDS,H <br /> OLTING <br /> Ms. Dawn BT tner,Zoning Adnvnistrator <br /> City of Pequot Lakes <br /> 4638 County Road l 1 <br /> Pequot Lakes, MN 56472 <br /> RR Proposed Plat of Sibley Acres VIA EMAIL&MAIL <br /> Pequot Lakes, MN <br /> WSN Job No. 0130B0000 <br /> Dawn: <br /> As the City Council instructed, I will work with you on Tequests for infornation <br /> On January U,2005 we received a January 7 letter from Kevin McCor nick,Land Survey <br /> Direoor at Landecker&Associates on the above referenced subject; specifically asking our <br /> opinion on the layout of the proposed eul-de-sac. I did speak with Kevin about neeftg to go <br /> through you and the City first, Kevin understood and was not trying to circuzr;vent anybody or <br /> any process. <br /> - Kevin's January 7 inquiry regarded a suggested replacement of the circular Cul-de-sac with a"T"- <br /> shaped turn around. I understand that the circular cul-de-sac already received preliminvy <br /> approval. It is true that compared to the' - cul-de-sac, the circular layout will require more area, <br /> ew hwork fill, and cost_ .ke'8 n brought up an issue of safety. Both layouts appear to be adjacent <br /> to the existing low spot, so this is an arguable point. I would think that the School District and the <br /> City's Maintenance Superintendent,Mike Laven,might appreciate the circular layout for school <br /> buses and snowplowing, respeetively(maybe this was already taken into account when the <br /> circular layout received prethminmy approval). <br /> Have 'T''layouts worked? Yes. But short of other information, I'm not in a.position to say the <br /> Planning ComEmsion has to change their previous approval of the prep-rfmary plat with the <br /> — <br /> circular cul-de-sac. <br /> If you have a1ay questions, do not hesitate to call. <br /> WIDSETH SMITI�.NjOLTING <br /> Timothy M. Houle P.E. <br /> I <br /> C, K.eviu. McCormick, Landecker, via Email(pequot(�landecker.com) only <br /> Mice Rude, WSN <br /> WSN File <br /> I <br /> A:UOB113oNpIARb600 t3eaACORRI2]nwa 0�25Q5-SbleyActrs cal de sic comd�snhFltrdoc <br /> 78014 hidustriol Park Rood m PO Box 272p . <br /> Baxter,MN 564252720 ® IEt:2T8.829,5117 , Fax,218.829.2517 s WEB:v w",W$n-mnxom <br /> _ FNt;INFERlNG gRCH1TFCTURE LAND SURVEYING ' <br /> ENVrRONMEN7Ai <br />
The URL can be used to link to this page
Your browser does not support the video tag.