My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09.05 - Facility Addition Feasibility Study
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2016
>
08-02-2016 Council Meeting
>
09.05 - Facility Addition Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/27/2016 2:56:28 PM
Creation date
7/27/2016 2:56:26 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of <br /> AGENDA ITEM #9.5 <br /> Pequott <br /> Lakes - <br /> REPORT TO <br /> CITY COUNCIL <br /> Report Prepared by: Nancy Malecha <br /> Date: August 2, 2016 <br /> Subject: Facility Addition Feasibility Study <br /> Report: The following is a succinct list of Council's comments <br /> from the June and July Council Meetings that Tim Houle and I <br /> compiled regarding the Maintenance Department Facility Addition <br /> Feasibility Study. <br /> 1. A new Maintenance Facility using a pre-engineered timber <br /> column structure instead of a pre-engineered steel building <br /> system (both with in-floor heat). The estimated cost would go <br /> from $120 per square foot for the latter to $100 per square foot <br /> for the former. <br /> 2. A new Maintenance Facility using either of the two above <br /> building construction types would require an automatic <br /> sprinkler system. <br /> 3. With the estimated cost difference between a stick-built versus <br /> a fabric dome type salt shed, list out some pros and cons of <br /> both. Determine the useful life and replacement cost of a <br />
The URL can be used to link to this page
Your browser does not support the video tag.