My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09.02 - WWTF Row Irrigation Change Order No. 2
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2016
>
08-02-2016 Council Meeting
>
09.02 - WWTF Row Irrigation Change Order No. 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/27/2016 2:52:33 PM
Creation date
7/27/2016 2:52:32 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
the sprinklers. However, the remaining replacement solenoids are <br /> not scheduled to arrive until the Contract's August 1 st Substantial <br /> Completion date, the date when the Contractor was to have a fully <br /> operational system for the City. <br /> The Contractor, WSN, and the supplier will be taking care of the <br /> costs involved with these replacement solenoids. <br /> As such, we believe a Contract Time extension via a Change Order <br /> is appropriate. We are presently working with the Contractor and <br /> his supplier to finalize dates so we can provide you with a specific <br /> Contract Time Extension Change Order. We anticipate it would be <br /> an extension of a week or two. <br /> To minimize the operational impacts of this time extension, the <br /> Contractor, City, Operator, and WSN personnel have been working <br /> through options of irrigating some quantities of wastewater during <br /> the start-up/troubleshooting phase. <br /> At this time, no Council action is requested as this is merely an <br /> update on a forthcoming Change Order. <br /> Council Action Requested: No Council action requested. <br />
The URL can be used to link to this page
Your browser does not support the video tag.