Laserfiche WebLink
November 4, 2004 <br /> MONTHLY WATER/WASTEWATER REPORT—OCTOBER 2004 <br /> Water Plant: All working fine, no problems this month. <br /> Fire Hydrants & Water Mains: Hydrant#12, replaced the main seat and valve in the <br /> hydrant. Needs new isolation valve installed. Will wait until the highway issues are <br /> addressed before repairing. <br /> Pond/Blowers: Ponds are at proper depths for the winter months storage. <br /> Lift Stations: All working fine. No problems this month. <br /> Sanitary Sewer: No backups. All working fine. <br /> General Comments: MPCA had an annual compliance inspection for the Wastewater <br /> Facility. All went great! (See attached report sheet.) The sanitary sewer is in on the <br /> sewer extension project. The water should be complete within the next week. Due to the <br /> time and street considerations on the extension next to the vet clinic, I recommend that it <br /> take place in the spring. This seems to be the recommendation with WSN also. <br /> Sincerely, <br /> i <br /> BRETT TWARDY <br />