d. The City will have ten(10)business days to approve a design, once complete. <br /> However,the City will make every attempt to process designs as quickly as <br /> possible. <br /> e. The City will notify the designer when approved and issue the Permit. <br /> f. The designer must pick up the Permit. Permit and Inspections fees must be paid <br /> prior to Permit being surrendered. <br /> g. Inspections can be scheduled up to 48 hours in advance, but no less than 24 hours. <br /> The Permit number must be given when scheduling an Inspection. <br /> 6 Pequot Lakes Zoning Ordinance No. 195, Section 25.040 Minimum Lot <br /> Requirements and Setbacks C.1, states ". . . On Site Sewage System Setbacks (in feet) <br /> from the Ordinary High Water Level: <br /> Lakes: Sewage Treatment System <br /> Natural Environment 200 <br /> Recreational Development 100 <br /> General Development 75 <br /> Rivers: <br /> Remote 200 <br /> Agricultural, Urban, Tributary 100" <br />