Laserfiche WebLink
City of Pequot Lakes Proposal <br /> Page 2 <br /> Construction services such as administration, staking and observation are not included in this <br /> proposal. If these services are required, we can give you a proposal at a later time. We would <br /> anticipate working with Brett on how much assistance he would need during this phase. <br /> Note that our proposal does not include soil borings. The Contractor may need to obtain these at <br /> his/her own cost. <br /> SCHEDULE <br /> WSN proposes to complete the plans, specifications, and MDH permit application within 45 days <br /> of your authorization to proceed. <br /> If you are in agreement with our proposed scope of services, please sign below and return one <br /> copy of this letter to WSN as our authorization to proceed. We appreciate the chance to present <br /> our proposal and look forward to working with you. <br /> Sincerely, <br /> Timothy M. Houle, P.E. <br /> Vice President <br /> Enclosures (General Provisions, Fee Schedule) <br /> c: Don Anderson,WSN <br /> WSN File <br /> ................................................................................................................................................................. <br /> Proposed by WIDSETH SMITH NOLTING <br /> t 1A (k) a� <br /> Kevin B. Wernberg,Vic President <br /> Accepted by the City of Pequot Lakes: The above proposal and attached General Provisions <br /> of Professional Services Agreement are satisfactory and WSN is authorized to do the work as <br /> specified. Payment will be made monthly in accordance with the terms on the attached fee <br /> schedule. <br /> Printed Name Title <br /> Signature Date <br /> Printed Name Title <br /> Signature Date <br /> MAPROPOSAU2004 PROPOSALS\City of Pequot Lakes It Figures Proposal.doc <br />