Laserfiche WebLink
City of Pequot Lakes, MN <br /> 2005 Evenson Road Improvements <br /> TECHNICAL SPECIFICATIONS <br /> The bituminous spillway work shall consist of furnishing all labor, <br /> material, and equipment to install the spillways and properly grade <br /> around them; and shall be measured and paid for at the ton price bid <br /> for Wearing Course Mixture. <br /> F. AGGREGATE SHOULDERING (MnDOT 2221) <br /> 1. The aggregate shoulders shall be constructed in accordance with the <br /> provisions of MnDOT 2221, except as modified below. <br /> 2. The aggregate shoulders shall be compacted by the Quality Compaction <br /> Method. <br /> 3. The following shall be added onto the end of 2221.3D: <br /> a. When the aggregate shoulders are completed, the shoulders <br /> shall be in reasonable close conformity with the slope of the <br /> roadway. <br /> End of Technical Specifications <br /> Page 4 of 4 <br /> C:\Documents and Settings\Administrator\Local Settings\Temporary Internet Files\OLKB\Technical Specifications.doc <br />