July 5, 2005 * * * DRAFT * * ' Page 3of7 <br /> Pequot Lakes <br /> Government Drive Proposal <br /> Costs to be paid for from the City Street budget, via special assessments to the abutting <br /> property owners, or from a combination of the two. <br /> 5. As mentioned above, there are no turn lanes anticipated due to this space being taken <br /> up by parking, thus, the CSAH 11/Main Street intersection would look similar to what it <br /> does today. <br /> MnDOT's latest layout shows a concrete center median extending from TH 371 back to <br /> the east on CSAH 11/Main Street, stopping just shy of Government Drive. <br /> However, considering some models of future traffic, it should not be a surprise that this <br /> median may extend further east resulting in both the south leg and north leg of <br /> Government Drive being a right in —right out at CSAH 11/Main Street. <br /> A CSAH 11/Main Street center median cutting across Government Drive will have to be <br /> coordinated with MnDOT and the County. <br /> 6. There will be diagonal parking on both sides of the through lanes. <br /> Diagonal parking limits the crossing movements of 90-degree parking and will hopefully <br /> provide for the possibility of smoother and safer traffic along Government Drive. <br /> Costs to be paid for from the City Street budget, via special assessments to the abutting <br /> property owners, or from a combination of the two. <br /> 7. Concrete curb and gutter will, at a minimum, be placed on the east side. <br /> On the west side, if drainage can be handled in grassed swales, there will not be <br /> concrete curb and gutter. Otherwise, there will be concrete curb and gutter on the west. <br /> Costs to be paid for from the City Street budget, via special assessments to the abutting <br /> property owners, or from a combination of the two. <br /> 8. There will be a concrete sidewalk, roughly the same width as present, on the east side <br /> between the buildings and the concrete curb and gutter. <br /> There will be no sidewalk on west side, as depending on the drainage arrangements, <br /> there may not be curb and gutter on this side, plus the Paul Bunyan Trail is on this side. <br /> Costs to be paid for from the City Street budget, via special assessments to the abutting <br /> property owners, or from a combination of the two. <br /> 9. Does the City want the wooden rail fencing on the west side? <br /> Does the City want benches, decorative light poles, or other aesthetics incorporated into <br /> this project? <br /> Any costs to be paid for from the City Park budget/fund. <br /> CADocuments and Settings\Administrator\Local Settings\Temporary Internet Files\OLKB\Draft Government Drive proposal.doc <br />