My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08.01 - Sewer Line
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2005
>
06-07-2005 Council Meeting
>
08.01 - Sewer Line
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2016 11:56:09 AM
Creation date
7/15/2016 11:56:08 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6. Regular checking of manholes on this affected sewer main on <br /> �. Mondays, Wednesdays, and Fridays. <br /> It was also discussed that replacement and/or repair of this main sewer line <br /> from the School to UBC Lift Station #1 will be replaced when possible. The <br /> issue of monies available was brought up. The City of Pequot has no money <br /> to replace this line at this time. It was decided that the City will begin <br /> budgeting each year for the repair and/or replacement of this line within the <br /> next 10 years, or when the money is available. <br /> The City will get a cost estimate from the City Engineer, WSN, for the <br /> possible repair, relocation, and replacement of this sewer main. <br /> Members Present at this meeting were: <br /> 1. Mayor— Cathy Malecha <br /> 2. Council Member, Sewer Liaison— Tom Ryan <br /> 3. City Clerk— Sandy Peine <br /> 4. Wastewater/water Superintendent—Brett Twardy <br />
The URL can be used to link to this page
Your browser does not support the video tag.