Laserfiche WebLink
`'- Exterior walls to be insulated with R-19 fiberglass bait. The <br /> attic shall have an R-44 blown-in insulation. Soth to have a <br /> 4 m 1 vapor retarder. <br /> - 5/8" gypsum board on all exterior walls and ceiling. <br /> gypsum board on the interior walls. Taped, sanded, primed <br /> and painted. <br /> - Interior doors to be raised panel oak. interior trim to be <br /> Princeton oak, casing and base. Stained and varnished. <br /> - The electrical system is to be installed to code by a <br /> certified electrician. Each office unit is metered <br /> individually so that the tenant will be responsible for their <br /> own utilities. <br /> - The plumbing Natem Is to be installed by a master plumber. <br /> Each office has their own accessible restroom with access <br /> grab bars by the toilet. The city sewer and water will be <br /> hooked up to the building. <br /> - The heating and cooling system will be installed by a <br /> certified professional. The ductwork will be installed below <br /> the concrete slab and each unit will have their own furnace, <br /> air exchanger and air conditioning unit. <br /> - The floor covering to be a commercial grade carpet and <br /> vinyl the in the restrooms and in front of all exterior doors. <br /> - All restrooms to have a toilet paper holder, paper towel <br /> dispenser, 24" x 42" plate glass mirror, 2- access grab bars, <br /> 1- wall hung lavatory and 1- accessible toilet. <br /> - Each unit shall have 2- 32" x 24" signs. One on the building <br /> by their entry door and the other to be Incorporated into <br /> one large sign by the road. Each unit shall also have. their <br /> own mailbox by the road. <br />