My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12.01 - 12.03 - Highway 371 Update, County Road 11 Feasibility Study, Marshall Street Drainage
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2005
>
02-01-2005 Council Meeting
>
12.01 - 12.03 - Highway 371 Update, County Road 11 Feasibility Study, Marshall Street Drainage
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/31/2016 9:39:19 AM
Creation date
7/12/2016 2:58:05 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
January 4,2005 Page 4 <br /> Proposal for CSAH 11 Consulting Services <br /> City of Pequot Lakes <br /> While subsequent phases/work to this study is estimated in Task No. 8 above,the actual scope <br /> and effort for these subsequent phases will need to be reviewed after the completion of this <br /> study. <br /> This section will also include some discussion on the mileage of the realigned CSAH 11, the <br /> mileage of Front Street and Main Street that would be turned back to the City, and the next steps <br /> for the County and the City to take if they want to proceed with this project. <br /> Note that the County and City budgets will be a major factor in time finesf©r moving forward with <br /> such a realignment. <br /> 10. Prepare abound report. <br /> All of the above will be bound into a report and distribiit",,iAp the City an" County for their <br /> review. " <br /> Our efforts include meeting once each with th -rid the(bounty to take thei ents,� <br /> incorporating them into an updated report, and re- uting, <br /> WSN will complete this study within 90 days of authorization by City Council meeting.We have <br /> included a week period for appropriate City acid County responseng the above tasks. <br /> zr� <br /> While it is too early to say, our desire would b ny possible reerent with MnDOT's TH 371 <br /> improvements. ; " <br /> To perform the above tasks, we estimate our effo lat <br /> We propose to perform oservic ..an hourly base, in accordance with the attached fee schedule. If <br /> you are in agreement ur propo scope of servios, please sign and return one copy of this letter <br /> for our records.We appr the opportunity to work wrou on this improvement that will impact both <br /> the City of Pequot Lakes an are ��Ow Wing CoUhty. <br /> R r,r <br /> Widseth Srt <br /> 3 <br /> Timothy .� Wle, P.E. €s . <br /> Vice-Preside <br /> Enclosures: `- <br /> 11"x 17" 'C o*,ter�f2ip' <br /> 11"x 17" 'USG9p" <br /> Fee Schedule ; ' <br /> c: Don Anderson, WSN <br /> Mike Rude,WSN <br /> Mary Devine,WSN <br /> WSN File <br /> MAProposals\2005 Proposals\Pequot Lakes CSAH 11 Consulting.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.