My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12.01 - 12.03 - Highway 371 Update, County Road 11 Feasibility Study, Marshall Street Drainage
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2005
>
02-01-2005 Council Meeting
>
12.01 - 12.03 - Highway 371 Update, County Road 11 Feasibility Study, Marshall Street Drainage
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/31/2016 9:39:19 AM
Creation date
7/12/2016 2:58:05 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
January 4,2005 Page 3 <br /> Proposal for CSAH 11 Consulting Services <br /> City of Pequot Lakes <br /> Our efforts include one meeting each with the City and the County to review the horizontal <br /> alignments and the typical sections. <br /> 6. Layout a preliminary storm drainage system. <br /> As a part of this study, we will not perform hydrologic and hydraulic calculations and design. <br /> Instead,we will use our best engineering judgment to locate catch basins, piping, and discharge <br /> area(s). <br /> 7. Identify a Right-of-Way corridor. <br /> We will layout requirements for new R/W. <br /> Our proposal does not include attending meetings 4.1 een the City and pr tr owners. If <br /> needed,we can do this as additional work. k <br /> Identifying the R/W corridor is a first step in posslEi. signalhis CSAH 11 regnment under <br /> the Official Mapping Statutes. This provides the City " Ides regarding managing use of the <br /> designated route. <br /> While our proposal does not include he City wants use epare legal descriptions and <br /> sketches for the R/W corridor,to be in as part of the apping requirements,we <br /> can do so as extra work. <br /> 8. Estimate project costs. <br /> 5. <br /> For each horizo align Iternative besides calculating estimated quantities and applying <br /> unit prices to up with a timated construction cost,we will estimate R/W acquisition (legal <br /> descriptions end es, le acquisition do' ts, discussions with property owners, and <br /> price of the land); p na hase ei i ring; design phase engineering; construction <br /> phase b' stakin rvstration);and contingencies. <br /> h :a <br /> 9. Lid rather item sider � 1 <br /> title environmenta es will entified (e.g. possible impacts to wetlands, noise, erosion <br /> co k.1during constru , etc.),, his study does not include delineation of wetlands. Wetlands, if <br /> prese ill be visually y ntifed but the actual delineation of them is generally accounted for in <br /> subseq hases. If A".find ourselves in a situation where a wetland may have a significant <br /> impact on ro�ect,w0 will address this as extra work. <br /> This study also' `'°` not include soil borings.While there is always that possibility,we do not <br /> anticipate the soj of this area will have an adverse impact on construction or cost. Soils borings <br /> and a geotechncal report(more for the benefit of bidders)would be conducted during the design <br /> phase. <br /> A possible realignment of CSAH 11 may be impetus for a master plan of the downtown area.At a <br /> minimum, it provides some opportunities to look at parking, pedestrians, etc. on Main Street. <br /> M:\Proposals\2005 Proposals\Pequot Lakes CSAH 11 Consulting.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.