My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Handouts from the January 11, 2006 Council Meeting
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2006
>
01-11-2006 Special Council Meeting
>
Handouts from the January 11, 2006 Council Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2016 10:05:50 AM
Creation date
7/7/2016 3:14:08 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mr. Ron Wickham Page 3 January 11, 2006 <br /> Anderson Brothers Construction <br /> 0.3 feet per day. Considering the higher velocity and no retardation of the <br /> petroleum plume, it would travel about 550 feet in 5 years; plumes from limited <br /> petroleum releases typically stabilize and attenuate before traveling several <br /> hundred feet. <br /> Leak detection measures should also be included in the SPCC plans, including <br /> installation and sampling of shallow groundwater monitoring wells. We plan to <br /> assist Anderson Brothers Construction with developing a monitoring network and <br /> schedule, once logistics of the operations are chosen. The monitoring wells will <br /> be 2-inch diameter SCH 40 PVC, screened across the groundwater table and <br /> installed in accordance with Minnesota Department of Health regulations. <br /> The monitoring wells will also be used to measure groundwater levels. Mining <br /> operations reportedly will require about 2 million gallons of water to be pumped <br /> per year for this site, roughly equal to pumping 4 gallons per minute continuously. <br /> Given the hydrogeologic conditions and estimated aquifer properties, we <br /> estimate that this would cause the water table to drop less than 1 inch beyond <br /> 500 feet from the well; the farther from the well, the less the drop will be. In our <br /> opinion, this will not noticeably affect nearby water wells or lakes. Furthermore, <br /> the pumped water will be used to "wash" clay and silt from the gravel, after which <br /> the water will infiltrate to the aquifer; the silt and clay sediments will be reclaimed <br /> from the infiltration basin and mixed with Class 5 aggregate. <br /> In our opinion, mining operations, if done properly following an appropriate SPCC <br /> plan, do not pose a significant risk to either the underlying aquifer or surrounding <br /> surface waters. <br /> Closure <br /> We look forward to presenting our findings at the upcoming Pequot Lakes City <br /> Council meeting. If you have any questions regarding this letter, please call us. <br /> Sincerely, <br /> GM C. <br /> I <br /> Senior Environmental veer <br /> Enclosures: Regional Location Diagram <br /> Nearby Water Wells diagram <br /> List of nearby water wells in the CWI database <br /> Resume <br /> cc: Pequot Lakes City Council <br /> RWP:fhs I I:VwpXReviewAlxiCommentLetter.doc <br /> GMIE CONSULTANTS,INC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.