My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10.01 - South Oak Street
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2006
>
08-01-2006 Council Meeting
>
10.01 - South Oak Street
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/7/2016 10:20:35 AM
Creation date
7/7/2016 10:20:34 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
June 28, 2006 Page 5 of 6 <br /> Pequot Lakes <br /> South Oak Street Proposal <br /> X. Construction Phase <br /> Provide for construction staking, on-site observation, and construction <br /> contract administration. <br /> This is based on an 8-week long construction schedule. Our cost for this <br /> phase is estimated because our efforts can be impacted by the <br /> construction contactor's means and methods, by weather, and by other <br /> factors beyond our control. <br /> If the City desires conformed to construction record drawings, this would be <br /> treated as additional work and we would provide an estimate of our effort if <br /> requested. <br /> Total Construction Phase: Estimated $104,000 <br /> WSN will complete the plans and specifications for this project within 90 days of authorization by <br /> the City. <br /> If you are in agreement with our proposed scope of services, please sign below and return one <br /> copy of this letter to us as our authorization to proceed. We appreciate the opportunity to serve <br /> the City. <br /> WIDSETH SMITH NOLTING <br /> Timothy M. Houle, P.E. <br /> CAMy Documents\City clerk\Engineering\South Oak Street\Pequot Lakes-South Oak Street-Proposal-062806(2).doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.