My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08.01 - Water/Sewer Rate Study
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2006
>
07-05-2006 Council Meeting
>
08.01 - Water/Sewer Rate Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/7/2016 9:06:49 AM
Creation date
7/7/2016 9:06:48 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mr. Brett Twardy <br /> WaterNVastewater Supervisor <br /> Re: Proposal and Letter Agreement Between Owner and Engineer <br /> Rate Study for Water and Wastewater Utilities <br /> City of Pequot Lakes, Minnesota <br /> June 6, 2006 <br /> Page 5of6 <br /> Engineering Fees <br /> AE2S proposes to render the Scope of Services of this Agreement for a lump sum amount of <br /> eleven thousand, nine-hundred and forty dollars ($11,940). <br /> ANTICIPATED <br /> DESCRIPTION FEE <br /> 2007 Rate Study for the Water Utility $ 3,970 <br /> 2007 Rate Study for the Wastewater Utility $ 3,970 <br /> Total for Rate Studies (completed in 2006) _ $ 7,940 <br /> 2008 Rate Planning Assistance - Update to the Water $ 980 <br /> Utility Rate Study <br /> 2008 Rate Planning Assistance - Update to the $ 980 <br /> Wastewater Utility Rate Study <br /> �. 2009 Rate Planning Assistance - Update to the Water $ 1,020 <br /> Utility Rate Study <br /> 2009 Rate Planning Assistance - Update to the $ 1,020 <br /> Wastewater Utility Rate Study <br /> Total for all Rate Studies and Updates = $ 11,940 <br /> Standard Terms and Conditions of this proposal are included as Exhibit A. <br /> Performance Schedule <br /> It is our understanding that the City of Pequot Lakes intends to use the results of the Rate Study <br /> to adjust utility rates, as necessary, effective January 1, 2007. To accommodate the City's <br /> desired schedule, AE2S will present the results of the completed project by September 15, <br /> 2006. <br />
The URL can be used to link to this page
Your browser does not support the video tag.