My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05.03 - Park Board Update
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2006
>
05-02-2006 Council Meeting
>
05.03 - Park Board Update
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2016 2:06:42 PM
Creation date
7/1/2016 3:45:01 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
BIDS FOR INSTALLING SPRINKLING SYSTEM <br /> AND SEEDING TRAILSIDE PARK <br /> The Cutting Edge- $14,942 <br /> Does not include sprinkler system for north and south ends of park <br /> Does not include hydroseed, <br /> Does not include black dirt <br /> Does not include grading and spreading black dirt <br /> Rainbow Lawns—9,273.19 <br /> Does not include hydroseed, <br /> Does not include black dirt <br /> Does not include grading and spreading black dirt <br /> St. Joseph Plumbing and Heating Service- $9,007.42 <br /> Does not include sprinkler system for north and south ends of park <br /> Does not include hydroseed, <br /> Does not include black dirt <br /> Does not include grading and spreading black dirt <br /> Abear's Pequot Sand and Gravel- $18,536 <br /> Includes sprinkler system for north and south ends of park <br /> Includes hydroseed, <br /> Includes black dirt <br /> Includes grading and spreading black dirt <br />
The URL can be used to link to this page
Your browser does not support the video tag.