My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09.03 - Facility Addition Feasibility Study
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2016
>
07-05-2016 Council Meeting
>
09.03 - Facility Addition Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/29/2016 3:36:09 PM
Creation date
6/29/2016 3:36:07 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
AGENDA ITEM #9.3 <br /> City Of <br /> Pequott <br /> Lakes — <br /> REPORT TO <br /> CITY COUNCIL <br /> Report Prepared by: Tim Houle & Nancy Malecha <br /> Date: July 5, 2016 <br /> Subject: Facility Addition Feasibility Study <br /> Report: At the June 7th City Council Meeting, the <br /> consensus of the Council was to defer further discussions <br /> on the attached Maintenance Department Facility Addition <br /> Feasibility Study to allow for comments from the absent <br /> Council Members. <br /> As directed, WSN studied the option of expanding the <br /> existing City Hall building to the north to provide more <br /> space for Public Works. We also reviewed the possibility of <br /> a separate Public Works facility. Just to note, these were <br /> study-level reviews; not even preliminary design-level. In <br /> the report, we have tried to highlight those compliant and <br /> non-compliant items in the existing building. As indicated, <br /> if the existing building was expanded, there are some non- <br /> compliant issues that would then need to be addressed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.