Laserfiche WebLink
AGENDA ITEM #9.3 <br /> City Of <br /> Pequott <br /> Lakes — <br /> REPORT TO <br /> CITY COUNCIL <br /> Report Prepared by: Tim Houle & Nancy Malecha <br /> Date: July 5, 2016 <br /> Subject: Facility Addition Feasibility Study <br /> Report: At the June 7th City Council Meeting, the <br /> consensus of the Council was to defer further discussions <br /> on the attached Maintenance Department Facility Addition <br /> Feasibility Study to allow for comments from the absent <br /> Council Members. <br /> As directed, WSN studied the option of expanding the <br /> existing City Hall building to the north to provide more <br /> space for Public Works. We also reviewed the possibility of <br /> a separate Public Works facility. Just to note, these were <br /> study-level reviews; not even preliminary design-level. In <br /> the report, we have tried to highlight those compliant and <br /> non-compliant items in the existing building. As indicated, <br /> if the existing building was expanded, there are some non- <br /> compliant issues that would then need to be addressed. <br />