Laserfiche WebLink
Item 15—Verify drainaae on the northwest side of the south cul-de-sac(station 6+75) <br /> We have verified that the bituminous in the cul-de-sac drains to the catch basin. <br /> Miscellaneous Items <br /> The two newly planted trees that would ultimately obstruct the visibility of the project stop signs <br /> have been relocated. <br /> At the beginning of Paul Circle there is curb and gutter that needs to have earth placed behind it <br /> on both sides of the road. <br /> At this time we feel that the remaining items to be completed have a value of$27,000 and will <br /> recommend to the City of Pequot Lakes that your project bond be reduced to $33,750 which is <br /> 125% of the estimated value. <br /> If you have any questions or concerns regarding this please feel free to contact me or Will Hoyt <br /> at 568-4940. <br /> Sincerely, <br /> L�Jandecker& Associates,Inc. <br /> Bryan G. Drown,PE <br /> Cc: City of Pequot Lakes <br /> Tim Houle—City Engineer, Widseth, Smith, &Nolting(via e-mail) <br /> 061350 <br />