My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12.01 - Trailside Estates
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2007
>
11-06-2007 Council Meeting
>
12.01 - Trailside Estates
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2016 8:25:27 AM
Creation date
6/28/2016 8:25:26 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
connections and is approximately 18' below the surface it was decided to not <br /> excavate and replace this pipe at this time. The possible problem shall be noted <br /> on the record drawing and the pipe shall be considered for possible replacement <br /> or repair when any future connection is made to manhole 8. <br /> Item 3—Constructing ditching around the northwest cul-de-sac <br /> It is acceptable to leave this area as presently constructed. Please note that as driveways are <br /> constructed, care shall be taken so that run-off does not pond against the edge of the pavement <br /> and create future erosion problems. <br /> Item 4—Construct by-pass lane on County Road#112 <br /> 1. All power poles adjacent to the bypass lane need to be re-located to the right-of-way. <br /> 2. The by-pass lane has been striped. <br /> 3. A roadside ditch,while shallow, needs to be constructed along the bypass lane, as well as <br /> the ditch north of the bypass lane needs to be stabilized and turf established. <br /> 4. These items will be considered complete upon the approval of the Crow Wing County <br /> Highway Department. <br /> Estimated value of remaining work=$1,000 <br /> Item 5—Remove and replace cracked concrete curb and Butter sections as noted <br /> The cracks in the concrete curb and gutter have been filled with the Sealtight Futura— 15. The <br /> City of Pequot Lakes will monitor these areas next spring to see how they perform after going <br /> through the freeze/thaw cycle. <br /> Estimated value of remaining work=$1,500 <br /> Item 6—Remove and replace concrete curb and gutter north of CB -4 to provide positive <br /> drainage to the catch basin <br /> It was agreed that Car-Col will remove the concrete curb and gutter north and south of CB—4 <br /> and replace such that there is positive drainage. Car-Col will also remove and replace concrete <br /> curb and gutter south of CB—3 such that there is positive drainage to the catch basin. <br /> Estimated value of remaining work=$1,500 <br /> Item 8-Insta1115" GS apron and remove sediment from sump area (Trailside Loop Sta <br /> 0+28) <br /> It is acceptable to not require installation of the GS apron in lieu of the rip-rap apron that was <br /> installed. <br /> Item 11 —Construct rip-rap channel at station 10+00 left <br /> We requested that the area adjacent to Trailside Road east of the spillway be re-graded such that <br /> the shoulder slopes away from the bituminous. It was agreed to leave this area as graded until <br /> turf is established on the retention pond slopes adjacent to the roadway. Upon those slopes being <br /> stabilized the shoulder area will be re-graded to promote drainage off the bituminous and this <br /> area will be seeded or sod placed. <br /> Estimated value of remaining work=$500 <br />
The URL can be used to link to this page
Your browser does not support the video tag.