My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06.03 - Trailside Estates Project Update
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2007
>
09-04-2007 Council Meeting
>
06.03 - Trailside Estates Project Update
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/24/2016 3:25:41 PM
Creation date
6/24/2016 3:25:40 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Landecker 8c Associates, Inc. 4646 County Rd. 11 -P.O.Box 120•Pequot Lakes,MN 56472 <br /> Engineering• Surveying • Planning 218-568-4940- 888-866-4940•Fax:218-568-5404 <br /> www.landecker.com <br /> August 27, 2007 <br /> City of Pequot Lakes <br /> Attention: Sandy Peine—City Clerk <br /> 4638 County Road#11 <br /> Pequot Lakes, MN 56472 <br /> RE: Update on Punch List of Construction Items Remaining-Trailside Estates <br /> Dear Sandy, <br /> On Wednesday,August 22,2007 Will Hoyt and I met with Corky and Paul Smith to go over the <br /> progress made on the punch list dated August 7,2007 for the Trailside Estates project. At that <br /> meeting the following item numbers were considered complete and/or satisfactorily addressed: 2, <br /> 7, 9, 12, 13, 14, and 16-23. I have included a copy of the punch list items for reference. <br /> The following is a summary of the construction items remaining to be completed(bolded on the <br /> following page): <br /> Item 1 —Televising of the sanitary sewer mains is scheduled for August 28�'. <br /> Item 3—The Developer does not feel a ditch is needed in this area. <br /> Item 4—The by-pass lane has been paved. The Developer stated that Minnesota Power will be <br /> moving two power poles and striping will also be completed. <br /> Item 5 —Has not been addressed. <br /> Item 6—Has not been addressed. <br /> Item 8—The developer is waiting for turf to establish before cleaning up sediment in this area. <br /> Item 11 —The developer will construct the rip-rap channel upon removing the stockpile of <br /> topsoil located north of the proposed spillway. <br /> Item 15—Sediment needs to be removed from the south west cul-de-sac. <br /> If you have any questions or concerns regarding this please feel free to contact me or Will Hoyt <br /> at 568-4940. <br /> Sincerely, <br /> Landecker& Associates,Inc. <br /> 7,507" # tl)x&� <br /> Bryan G. Drown, PE <br /> Cc: Car-Col Construction <br /> Tim Houle—City Engineer, Widseth, Smith, &Nolting(via e-mail) <br /> 061350 <br />
The URL can be used to link to this page
Your browser does not support the video tag.