My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08.01 - Request for Proposals for Water/Sewer Rate Study
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2007
>
04-03-2007 Council Meeting
>
08.01 - Request for Proposals for Water/Sewer Rate Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/17/2016 11:57:41 AM
Creation date
6/24/2016 8:24:19 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Terms Used in This Report <br /> Affordability Index The monthly charge for 5,000 gallons of residential service divided by <br /> the median monthly household income for the area served by the <br /> system. An index of 1.0, meaning a household pays one percent of its <br /> income to pay its bill, is considered affordable. <br /> Capital Improvement Anticipated capital improvements. These are the more expensive <br /> Plan or Program (CIP) items such as water towers, treatment plants and lines, that generally <br /> require bond or grant funding. They do not include equipment <br /> Capital Improvement Cash reserves generally used to fund the CIP <br /> Reserves <br /> Coverage Ratio (CR) Incomes and reserves available to pay debt divide by the amount of <br /> the debt for that year. Most systems should have a CR of 1.25 or <br /> Current Position For a year, the sum of all incomes and reserves minus all financial <br /> obligations for that year. This is a good measure of overall financial <br /> health. <br /> Impact Fee Generally, a charge assessed to a property being connected to the <br /> system that recaptures all or part of the cost of the infrastructure <br /> needed to provide service to that connection. <br /> Infrastructure Hard assets, such as water towers, treatment plants and lines needed <br /> to provide service to customers connected to the system <br /> Operating Ratio (OR) Current incomes and undedicated reserves minus current expenses, <br /> not including debt. An OR of 1.0 is "break even." Most systems should <br /> have an OR of 1.25 or higher. <br /> Replacement A timetable that describes equipment replacement and important <br /> Schedule repairs that are too infrequent and/or too expensive to cover as annual <br /> operating costs but not so expensive that they need to be covered as <br /> capital improvements. <br /> Replacement Cash reserves used to fund the Replacement Schedule <br /> Tap fee Charge for allowing a property to be connected to the system. This fee <br /> may or may not include equipment or work provided by system staff. <br /> Test Year The one year period from which data was gathered to be the basis of <br /> the analysis <br /> User Fee, User Fees assessed to customers for use of the system. Does not include <br /> Charge tap fees, impact fees or other charges assessed when a property is <br /> first connected to the system. <br /> Working Capital (Net The amount left in the operating fund after paying all costs due during <br /> Income) that month year or other time period. Working capital of$0 is "break <br /> Working Capital Goal The desired percentage above "break even" for the operating fund. <br /> Small systems (a few hundred connections) generally should target 35 <br /> percent or greater. Larger systems can target less, down to a minimum <br /> of about 20 percent for systems with 5,000 or more connections. <br />
The URL can be used to link to this page
Your browser does not support the video tag.