Laserfiche WebLink
WASTEWATER: <br /> On Feb. 15th, Scott and Mike helped pull pump#2 from the Main Lift Station. <br /> Lance brought the tanker over so we could hose off the pump and work on it. I removed <br /> debris from the impeller and we got it working again. A plastic sewer cap had gotten <br /> lodged up in the impeller. It's working well now. <br /> Had a sewer back-up at Pfiefer Pharmacy on the same day. Kurt helped me jet the <br /> line and get things flowing again. Afterwards,he and Lance flushed some water down <br /> with the tanker. Mary was pleased that we were able to take care of it so quickly. <br /> On Feb. 16th, while checking manholes, I noticed that MH#82 and MH#8 were <br /> both backed up. Kurt and Lance brought jetter over and jetted from MH#7 up to MH#8. <br /> This got everything flowing again and nobody had any problems. <br /> On Feb. 28th, Bruce Peterson's sewer was backed-up so Lance and I jetted up MH <br /> #43 as far as we could. The line was frozen pretty solid, so I called Fyles in to thaw it for <br /> us. After that,Lance and I jetted from MH#41 to MH#43 to clean the lines more <br /> thoroughly. I'll be keeping a closer watch on it till the weather warms up. <br /> OTHER: <br /> I helped plow snow on Feb. 25th. Took care of Giovanni's parking lot,the <br /> Chamber parking lot and all of my water/sewer areas. Things are going very well, <br /> `-- working together with the Street Dept. and also with PRASD. <br />