My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8A - Minutes 092007
Laserfiche
>
Planning & Zoning
>
Agenda Packets
>
2007
>
10-18-2007 Planning Commission Meeting
>
8A - Minutes 092007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2016 11:56:10 AM
Creation date
6/15/2016 11:56:09 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
what had been permitted. The Planning Commission directed Staff to contact the Crow <br /> Wing County SWCD to make restoration recommendation. Staff met with the Pahls and <br /> Beth Hippert from the SWCD where Beth made a restoration plan. Shortly after that <br /> meeting, Staff realized the plan must be approved by the City Planner and left a message <br /> on Beth's voicemail indicating such. The City Planner looked over the notes provided by <br /> Staff and stated the sand blanket would not be acceptable. When Ms. Hippert had <br /> inquired as to her role, make property owner happy or restoration, she was advised it was <br /> restoration. <br /> No beach had been approved in the permit—no sand blanket asp of restoration. <br /> Mr. Pahl stated that he does not plan to bring in 11 yards of a would like to meet <br /> with the SWCD to discuss a restoration plan. The sand b, a Beth's idea and not <br /> requested by the Pahl's. <br /> Mr. Marohn stated that the permitted access to ock was not intend' :"be dug down <br /> to water level. There needs to be a barrier to irect off from ente lie lake. <br /> The only portion of the restoration plan in question i ; \' each area. The Planning <br /> Commission asked to have the histo ' ce ridge replac <br /> Base was not defined in the permit i the misun ding began. <br /> The yard is level and there eeds to be a b� some �o stop the spring runoff from <br /> entering the lake. They ds to be cl`; ,ed. <br /> An onsite visit wa a �' to se to attend Mark Hallan, Bill Habein, Beth <br /> Hippert,the Pahl's and Mr. p� 1 asked if he should have legal counsel <br /> attend, he that was 1 t s\ion. Staff will coordinate. Staff was asked <br /> to make�A�." opy o gnth' e\for Mr. Pahl. <br /> NEW NESS: <br /> a. Higb , 1 Study G" p Report: <br /> Mr. Marohn� ined n r 6 on page 15 had not been seen before. It was developed <br /> by Donjek to be ded this report. <br /> Chairman Woog stat that the Planning Commission cannot take comment as this was <br /> not a noticed public hearing. <br /> Pages 1 and 2 have not been seen before. They are a compilation of data collected. Mr. <br /> Marohn will make changes to bullet points 2 and 6 on page 1. <br /> Mr. Woog stated that we need to verify that the data is complete and give the Council a <br /> document that is complete. The Council requested the Planning Commission to provide a <br /> recommendation for them based upon this particular document. <br /> Minutes 8 <br /> Pequot Lakes Planning Commission <br /> September 20, 2007 <br />
The URL can be used to link to this page
Your browser does not support the video tag.