Laserfiche WebLink
in the Commercial district with an approved stormwater management plan <br /> for a 10-year, 24-hour storm event. <br /> 16.The applicant has significant space to accommodate an on-site sewage <br /> treatment system, proposing both a primary and alternate site. <br /> 17.The proposed building meets the maximum building height of 25 feet, <br /> measuring roughly sixteen feet as measured by Ordinance requirements. <br /> 18.The proposed structure and parking area meet all of the required <br /> setbacks, including the setback from the City right-of-way, setback from <br /> the side yard, and setback from the State right-of-way. <br /> Please note that the Planning Commission also added the following as conditions <br /> to the conditional use permit: <br /> 1. Seven similar coniferous trees shall be added between pond 1 and the <br /> parking lot. <br /> 2. Appropriate holding tank be shown on site plan. <br /> If you have any questions, please feel free to contact me. <br /> Sincerely, <br /> Dawn Bittner <br /> Zoning Administrator <br /> CC: Planning Commission <br />