Laserfiche WebLink
COMMUNITYGROWTH Go of <br /> 1 N 8 T 1 T U T E Pequut _ <br /> Fcperts in Small Touw Phjnnha g 6s-- <br /> `,. subject to the following conditions (only those applicable to the final platting process are <br /> listed): <br /> 2. Prior to submission of a final plat application,the following shall occur: <br /> a. The applicant shall submit a stormwater management/erosion control <br /> plan that handles the ioo-year,24-hour storm event in perpetuity. <br /> b. The stormwater management/erosion control plan shall be reviewed by <br /> the Planning Commission. The plan will be revised as directed by the <br /> Planning Commission. <br /> c. Following review and revision as directed by the Planning Commission, <br /> the stormwater management/erosion control plan shall be accepted by <br /> the Planning Commission and then become a controlling document for <br /> the development. <br /> 4. Prior to submission of a final plat application,the following shall occur: <br /> a. The applicant shall submit updated rental contract and association <br /> contracts to the City Attorney for review and approval. The documents <br /> shall address the following, at a minimum: <br /> L Mechanism for maintenance of common areas. <br /> ii. Mechanism for maintenance of open space areas. <br /> iii. Mechanism for maintenance of shore impact zone preservation <br /> areas and bluff zones. <br /> iv. The continued operation of Wilderness Resort as a commercial <br /> resort. <br /> v. The sale,use and maintenance of the storage units. <br /> b. Revisions shall be made to the documents to the satisfaction of the City <br /> Attorney. <br /> c. Once acceptable to the City Attorney,the documents shall be reviewed by <br /> the Planning Commission. Revisions shall be made to address Planning <br /> Commission concerns. <br /> d. Once Planning Commission member's concerns have been addressed,the <br /> Planning Commission shall approve the documents and they shall become <br /> controlling documents for the development. <br /> 5. Prior to submission of a final plat application,the following shall occur: <br /> a. The applicant shall submit information showing sewage treatment design, <br /> including capacity,treatment capability and conveyance mechanism. <br /> b. The sewage treatment design shall be reviewed by the City Engineer. <br /> Revisions to the plans shall be made to the satisfaction of the City <br /> Engineer. <br /> c. Once acceptable to the City Engineer, the design shall be reviewed by the <br /> Planning Commission. Revisions shall be made to address Planning <br /> Commission concerns. <br /> d. Once Planning Commission member's concerns have been addressed,the <br /> Planning Commission shall approve the design and it shall become a <br /> controlling document for the development. <br /> 6. Prior to submission of a final plat application,the following shall occur: <br /> a. The developer shall submit an updated vegetation enhancement plan. <br /> The plan shall detail preservation areas (natural areas) and the <br /> mechanism for preservation. At a minimum,the plan shall: <br /> vi. Restore and preserve all areas within the shore impact zone <br /> outside of the beach and picnic area, except for 8-foot walkways to <br /> the docking areas. <br /> Pequot Lakes Staff Report 3(a)-2 <br /> June i9,2oo8 <br />