My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3A - Conditional Use Application Wilderness Resort Villas
Laserfiche
>
Planning & Zoning
>
Agenda Packets
>
2008
>
04-17-2008 Planning Commission Meeting
>
3A - Conditional Use Application Wilderness Resort Villas
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/6/2016 3:33:16 PM
Creation date
6/6/2016 3:31:39 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
40.Middle Cullen Lake has 29, 416 feet of shoreline, as per GIS data provided by <br /> Crow Wing County. Wilderness Resort has a total of 2,653 feet of shoreline. The <br /> resort comprises 9.0%of the total shoreline on the lake. <br /> 41. Each unit is required to have 1.5 parking spaces, which is identified on the site <br /> plan. <br /> 42.The survey does not indicate where any signage will be placed. Signage will <br /> _. require a separate permit. <br /> 43•The existing resort contains a large number of RV sites, which will be removed. <br /> This will reduce the amount of large vehicle traffic to and from the resort. <br /> Planning Commission Direction: The Commission can recommend approval of the <br /> conditional use permit,recommend denial, or table the request if additional information <br /> is needed.If the recommendation is for approval or denial,findings of fact must be cited. <br /> Staff Recommendation: Based on the findings of fact contained in this report, we <br /> recommend that the Conditional Use Permit for a Planned Unit Development be <br /> approved,with consideration given to the following conditions: <br /> Conditions: <br /> 1. All previous Conditional Use Permits on this property are superseded by this <br /> permit. All previous CUP's are null and void. <br /> 2. Prior to submission of a final plat application,the following shall occur: <br /> a. The applicant shall submit a stormwater management/erosion control <br /> plan that handles the loo-year,24-hour storm event in perpetuity. <br /> b. The stormwater management/erosion control plan shall be reviewed by <br /> the Planning Commission. The plan will be revised as directed by the <br /> Planning Commission. <br /> c. Following review and revision as directed by the Planning Commission, <br /> the stormwater management/erosion control plan shall be accepted by <br /> the Planning Commission and then become a controlling document for <br /> the development. <br /> 3. A site inspection by the City Staff of all erosion control devices shall occur prior to <br /> any construction on the site. The City shall be given seven days notice of when <br /> the inspection is requested. <br /> 4. Prior to submission of a final plat application,the following shall occur: <br /> a. The applicant shall submit updated rental contract and association <br /> contracts to the City Attorney for review and approval. The documents <br /> shall address the following,at a minimum: <br /> i. Mechanism for maintenance of common areas. <br /> ii. Mechanism for maintenance of open space areas. <br /> iii. Mechanism for maintenance of shore impact zone preservation <br /> areas and bluff zones. <br /> iv. The continued operation of Wilderness Resort as a commercial <br /> resort. <br /> v. The sale,use and maintenance of the storage units. <br /> b. Revisions shall be made to the documents to the satisfaction of the City <br /> —' Attorney. <br /> c. Once acceptable to the City Attorney,the documents shall be reviewed by <br /> the Planning Commission. Revisions shall be made to address Planning <br /> Commission concerns. <br /> Pequot Lakes Staff Report 3(a)-7 <br /> April 17,2008 <br />
The URL can be used to link to this page
Your browser does not support the video tag.