Laserfiche WebLink
x <br /> Wilderness Point Resort <br /> Phased Construction Plan(Wastewater) <br /> fi <br /> 2008 <br /> .� z Unit Flow(GPD) EDUs <br /> p: Lodge 900 2 7 <br /> Collection-Lodge tank used as holding tank until connected to onsite treatment Size for pool building expansion. <br /> W Treatment-Pumper contract and disposal for first year of operation(July 2008-July 2009) <br /> a Treatment Area/Monitoring Well Areas-Clear/Grub x <br /> 6 Monitoring Well installation <br /> Z Engineering-Design/Permitting <br /> Z Misc.Admin <br /> x <br /> 2009 <br /> Unit Flow(G"D EDUs <br /> Pool" 500 1 ' <br /> 6 Lots 2,700 6 F <br /> Collection-Install 100%of pressure collection system from treatment area to all unit sites. <br /> Collection-Install gravity collection and lift station system for the 6 lots. <br /> Treatment- 50%of centralized recirculation tank and 25%of treatment system. <br /> Main Dosing Tank-100%of tank required. <br /> Disposal Field-50%of field constructed. <br /> t <br /> Abandon Water Well <br /> •- Misc.Engineering/Admin <br /> w <br /> -Backwashing of pool filters to be done on off-peak periods. <br /> IL <br /> 2010 s <br /> 9 Units 4,050 9 3 <br /> Stage 1 Treatment-25%of treatment system. <br /> STEP Systems <br /> Misc.Phasing Alterations <br /> Misc.Engineering/Admin <br /> i <br /> 2011 .3 <br /> i <br /> 9 Units 4,050 9 <br /> Phase 2 Treatment-50%of centralized tanks and 25%of treatment system. <br /> Disposal Field-50%of field constructed. <br /> STEP Systems <br /> Misc.Phasing Alterations <br /> Misc.Engineering/Admin <br /> N <br /> ai <br /> W d <br /> Q � <br /> -- = <br /> o_ 2012 <br /> 3 <br /> 9 Units 4,050 9 <br /> Stage 2 of Treatment-25%of treatment system. <br /> STEP Systems <br /> Misc.Phasing Alterations 1 <br /> Misc.Engineering/Admin ; <br /> f <br /> a <br /> 5 33 Units/ 16,250 36 <br /> oLodge/Pool GPD EDUs <br /> �— 030508PhasedCostSummary xis <br /> 3 <br /> e <br /> i <br />