My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9 - P&Z Admin Report
Laserfiche
>
Planning & Zoning
>
Agenda Packets
>
2016
>
04-21-2016 Planning Commission Meeting
>
9 - P&Z Admin Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/6/2016 2:51:00 PM
Creation date
6/6/2016 2:50:58 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
more than one year; or <br /> B. any nonconforming use is destroyed by fire or other peril to the <br /> extent of greater than 50 percent of its market value, and no <br /> building permit has been applied for within 18o days of when the <br /> property is damaged, in which case any subsequent use or <br /> occupancy of the land or premises shall be a conforming use or <br /> occupancy. <br /> Notwithstanding,the foregoing, any structure or use legally existing at the time of the <br /> adoption of an official control under this Chapter and which does not conform to the <br /> provisions of the Ordinance may be continued subject to the following: <br /> 2. No such structure or use shall be expanded, enlarged or intensified except <br /> in conformity with the provisions of this Chapter with consideration for variances <br /> thereto and consideration given for previously approved Planned Unit <br /> Developments. <br /> 3. A one-time addition to a non-conforming principle structure shall be <br /> permitted subject to the following: <br /> A. The non-conformity is due solely to setbacks. <br /> B. The addition is not within the shore impact zone. <br /> C. The addition will not encroach further into any setback. <br /> D. The size of the addition shall be proportionate to the percentage of <br /> the setback requirement that can be met. The amount of area a <br /> structure may be expanded shall be determined by the following <br /> tables: <br /> of Setback Met <br /> 1-50% Setback Tier One <br /> 51-99% Setback Tier Two <br /> Expansion <br /> Allowed <br /> Tier One 25% <br /> addition <br /> Tier Two 50 <br /> addition <br /> E. The total footprint of the structure, once the addition is completed, <br /> �. shall not exceed 2,500 square feet, including decks, porches, patios <br /> Page 3 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.