My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6B - Policy on Design Review Team (DRT)
Laserfiche
>
Planning & Zoning
>
Agenda Packets
>
2009
>
03-19-2009 Planning Commission Meeting
>
6B - Policy on Design Review Team (DRT)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2016 11:03:15 AM
Creation date
5/18/2016 11:03:15 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COMMUNITYGROWTH <br /> I N S T I T U T E n City of <br /> Eyperts iu Small Town Plonnitkg i equot <br /> OLD BUSINESS—POLICY ON DESIGN REVIEW TEAM Lakes-- <br /> Agenda Item:6(b) <br /> Background Information and Discussion: Based on the discussion from the <br /> February Planning Commission meeting, we have prepared a draft policy for <br /> establishment of a Design Review Team (DRT). We envision the Design Review Team <br /> having an informal role in the development review process (thus we are proposing a <br /> policy, not an ordinance amendment). If done properly, the DRT should provide a very <br /> productive bridge between the staff and the elected/appointed officials, hastening the <br /> review process and reducing overall costs for everyone. <br /> The policy can be adopted by the Planning Commission and forwarded to the City <br /> Council without a public hearing. <br /> Pequot Lakes Staff Report 6(b)-1 <br /> March 19,2009 <br />
The URL can be used to link to this page
Your browser does not support the video tag.