My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9A - P & Z Admin Report
Laserfiche
>
Planning & Zoning
>
Agenda Packets
>
2009
>
08-20-2009 Planning Commission Meeting
>
9A - P & Z Admin Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2016 11:30:44 AM
Creation date
5/16/2016 11:30:12 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pequot Lakes-Trailside Estates May 12,2009 <br /> Car-Col Construction Page 3 of 3 <br /> Even if you have questions or comments,we suggest you keep proceeding with our <br /> requests in this letter and the corrective work. During the original work,the City gave <br /> several time extensions—they have told us they will not do that again. <br /> WIDSETH SMITH NOLTING <br /> Timothy M.Houle,Y.E. <br /> City Engineer <br /> c: City of Pequot Lakes: Dawn Bittner, Sandy Peine,and Mike L.oven,all via <br /> Email only <br /> Pate Bonding,Inc.: via regular mail only, 1276 South Roberts Street, West St. <br /> Paul,MN 55118 <br /> Landecker&Associates: Will Hoyt,via Email only <br /> WSN: Mike Rude,Don Anderson,and WSN File <br /> i <br /> JA0130B•City of Pequot Lakes1013080034-Tmilsidc F-swes\013080034.000-Construction <br /> Services\Correspondence\20090512-insulate shallow depth watermain.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.