My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9A - P & Z Admin Report
Laserfiche
>
Planning & Zoning
>
Agenda Packets
>
2009
>
08-20-2009 Planning Commission Meeting
>
9A - P & Z Admin Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2016 11:30:44 AM
Creation date
5/16/2016 11:30:12 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pequot Lakes-Trailside Estates May 12,2009 <br /> Car-Col Construction Page 2 of 3 <br /> 5. Insulate above watermain <br /> 6. Backfill <br /> You will need to arrange for density and moisture tests. <br /> 7. Restore the surface improvements <br /> With the straight watermain segments under the curvilinear streets,we are open to <br /> you only needing to replace only one side of the curb and gutter and one-half of <br /> the pavement width. However,should your work carry you over the centerline, <br /> you will need to replace the whole pavement width. <br /> 8. Re-vegetate <br /> Replace topsoil(if stockpiled,otherwise,bring in new topsoil)on any disturbed <br /> areas,seed,fertilize,water,etc.to get a stand of grass growing. <br /> 9. Remove erosion control devices once the grass is established. <br /> Please note that the one-year correction period starts up again on this corrective work(the <br /> original one-year correction period will end August 5,2009 on the remainder of the <br /> project's improvements). <br /> C From our last meeting,it was mentioned that this situation may have occurred because a <br /> sanitary sewer manhole was constructed lower than called for in the plan. We do not <br /> know why the necessary number/height of barrel segments for the manhole were not on- <br /> site,or why it was decided to keep on constructing without waiting to install the <br /> necessary number/height of barrel segments.No matter the reason,please understand <br /> that the City does not see contributing to the cost of this work. <br /> Once we get your plan and corresponding schedule,the City will assign personnel to <br /> observe your work. Please note that we have not had conversations with the City on if or <br /> how the City will cover its own costs on this corrective work. <br /> Please complete this corrective work within 3 months-this should be plenty of time for <br /> this amount of work and allows for some seeding time. <br /> If this work is not completed by August 15,2009,including having a stand of grass,the <br /> City will have to pursue your bond or whatever other legal means are at their disposal. <br /> If you have questions or comments,it might be best to notify the City Clerk so she can <br /> convene a committee of the Couucil,as opposed to going before the entire City Council <br /> at one of their meetings. <br /> 1:\913013-City of Pequot Lakes\0130130034-Trailside Estates\0130B0034.900-Construction <br /> serviccslConrspondcnce\20090512-insulate shallow depth watermain.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.